Energy systems
Storage, solar & grid connection
The one line where the contractor is also the manufacturer. The pack, the hybrid inverter, the metering and the distribution board are built by the company installing them, and the grid application is carried by the same people — so the survey, the equipment, the connection and the commissioning certificate have one owner rather than four.
- Suited to
- Commercial sites · Industrial sites · Homes · Farms and estates · Telecom and grid edge
- Stages run
- 8 of 8
Its own steps, in chain order: Site survey → Design → Grid application → Supply → Installation → Commissioning → Handover → Monitoring.
- Battery storage
- Solar & hybrid inverters
- Panel boards & switchgear
- EV charging
- Grid connection
- Monitoring & aftercare
What you are left holding
- Electrical
- Installation certificate and test schedule
- Grid
- Application file and operator correspondence
- Drawings
- Single-line diagram and as-installed layout
- Settings
- Inverter, battery and protection settings record
- Assemblies
- Board schematics and labelled way schedules
- Operation
- O&M manual with isolation and shutdown procedure
- Monitoring
- Portal accounts and alert thresholds
- Warranty
- Equipment warranties and workmanship terms in writing